Project Name: Harvest Energy, SAGD Haul Road on Hwy 881
Project Location: Conklin, Alberta, Canada
GEOWEB® 3D System and High-Strength Geotextile Combine Forces to Create Upgraded, High-Performing Haul Roads Over Challenging Subgrades.
Project Background and Challenges
In fall of 2016, Harvest Energy contacted Presto Geosystems’ Canadian distributor, Layfield Group, to discuss options for the rehabilitation and upgrade of an existing access road to handle the rigors of a new plant expansion and commissioning. The modifications were being made to Harvest Operations Black Gold In-Situ Thermal SAGD plant located south of Conklin, Alberta Canada. The existing Encana By-pass road was 11.5 kilometers (km) (7.1 miles) long and originally served as a secondary access road into the facilities in the region, including Cenovus Christina Lake, Devon Pike, Jackfish and Kirby. The access road had not been in use for several years and became almost impassable during spring and summer rain events due to neglect. Layfield was requested to recommend load support options that would drastically improve the performance of the road.
One of the challenges was to keep the road operational during initial subgrade preparation and to stage reinforcement material and gravel in advance of the road being closed for repairs. Layfield’s execution plan called for the road to be closed for less than two weeks.
The Solution
The decision was made to deploy the GEOWEB Load Support System with Mirafi’s enhanced woven geotextile. The materials were chosen due to their performance and speed of deployment as the construction timeline was critical to the success of the project. The GEOWEB GW30V6 panels (mid-sized, 6-inch deep cell) and Mirafi HP270 were specified and supplied for the project.
Several sections of the access road were in such poor condition that additional sub-base reinforcement was required and consisted of a second GEOWEB layer and geotextile to further stabilize the weak road base.
These areas identified during subgrade preparation consisted of ~650 linear meters (.4 miles) of additional deployment. Layfield’s experienced team provided on-site technical support and installation training for the general contractor. They worked closely with the contractor and drifter project’s on-site manager to ensure a smooth and timely deployment of the materials.
The logistics required staging 335 pallets of GEOWEB panels and over 12 km (7.5 miles) of custom-sewn HP270 enhanced geotextile and were easily accomplished by the Layfield shipping department.
GEOWEB OIL & GAS HAUL ROADS
Project Results
The project was completed as designed during a very wet construction season. The initial deployment of GEOWEB panels and Mirafi enhanced woven geotextile in the areas initially identified as very poor were so successful that a second layer was not required. A key to installation speed was the use of the patented ATRA® Key device to connect GEOWEB panels side-to-side and end-to-end. Corrosion-resistant ATRA Keys are the strongest and safest connection method-dramatically speeding deployment of the GEOWEB panels.