Written By: Bill Handlos, P.E.
Properly designed porous pavement systems will not be damaged by the dynamics of freeze-thaw cycles.
For decades, civil engineering roadway designers have been trained to use positive drainage, crack sealing, and sealcoating to keep the area under pavement dry. The prevailing mentality was to use a well-graded, tightly compacted base under impervious concrete or asphalt wearing surfaces. When water gets between the well-graded base and the impervious surface, frost conditions would lift pavements, weaken the base structure, create potholes and, in general, wreak havoc with the life of the pavement.
So, it is not surprising that age-old tenets related to moisture, seepage, and freeze-thaw cycles get mistakenly applied to porous pavement systems.
What makes well-designed porous pavement cross-sections so resistant to the power of freezing and expanding water? The answer is space. Poorly graded crushed aggregate offers up to a 40% void ratio, which gives water a place to move and expand upon freezing, and a network of pathways to drain.
High void ratio systems allow the Earth’s natural warmth to move up from below the frost line into and through the open-air system just as water and ice-melt move through the system. If the water can’t permeate into the ground and becomes trapped in the open-graded base system, the voids allow expansion of the water as it forms into ice.
How Freeze-Thaw Affects Porous Pavement
There is more than one freeze type. There are dry freeze and hard dry freeze conditions that describe regions with low precipitation and multiple freeze-thaw cycles or only one or two freeze cycles, respectively. Neither of these freeze types challenges porous pavement systems because they lack moisture.
There are wet freeze regions having 15+ freeze-thaw cycles that require 6 to 12 inches of open-graded base course to safely allow expansion of the water that percolates and drains through the pavement and base throughout the cycles.
Then there is the more challenging hard wet freeze. This is the condition described by areas that have moderate to high precipitation combined with a frost depth that develops over several months. The National Ready Mixed Concrete Association offers a solid set of recommendations defining open-graded base course depth and the porous pavement depth, based on 65% of the maximum frost depth for the area. An area that gets 24 inches of frost depth should design for a 16-inch total pervious cross-section. The 16 inches includes the porous pavement, the open-graded base course, and any pervious subbase.
Concerns with freeze-thaw negatively affecting the performance of porous pavements are understandable but simply a myth. Because of their high void space and ability to allow expansion of water to ice, freeze-thaw cycles have little effect on porous pavements.
You can have all of the benefits of porous pavements with the comfort of knowing that freeze-thaw cycles will not damage your porous pavement.