— Alberta, Canada
Project Background In Alberta’s oil sands region, constructing access roads is challenging due to the soft subgrades like muskeg and… Continue Reading >
— Cambridgeshire, England
High-speed passenger trains in shared corridors introduce new challenges in managing the existing capacity of railroad systems. When slower-moving freight… Continue Reading >
— Jefferson County, Alabama
Cellular Confinement Tames Vertical Slope Written By: Frank Hogan & William Zeinert If you can’t move the hill, control it.… Continue Reading >
— North Yorkshire, United Kingdom
Project Background: In North Yorkshire, 20 months of work has been completed by Balfour Beatty on a £16 million ($21… Continue Reading >
— Fort Wayne, Indiana
Written By: Anne Marie Smrchek is Engineering Manager for the City of Fort Wayne, Ind. and Jim Blazek is Vice… Continue Reading >
— Ripon, North Yorkshire, UK
Project Background Copt Hewick Hall is a privately owned Grade II-listed building near Ripon, North Yorkshire, England. As part of… Continue Reading >
— Opa-Locka, Florida
Erosion of a stormwater canal caused by flooding and poor soils precipitates an erosion prevention and stormwater mitigation plan. Information… Continue Reading >
— Blair County, PA
The Problem In the fall of 2004, Legion Park representatives approached the Blair County Conservation District with a problem. The… Continue Reading >
— Charleston, South Carolina
PROJECT OVERVIEW: The CSX Charleston Intermodal terminal aggregate surface lot required base reinforcement due to poor subgrade conditions. The two… Continue Reading >
Bucyrus Road Base Stabilization
— Bucyrus, Ohio
PROJECT BACKGROUND Ohio DOT (ODOT) needed to establish a roadbase in an area that had poorly marked and shallow utilities… Continue Reading >